Underground Utility Installation

NO TRENCH.
NO PROBLEM.

PRECISION BORING. PROVEN RESULTS.
Jack & Bore • Pilot Tube Micro-Tunneling

Three Point Construction delivers trenchless utility installation with hands-on execution, field-proven problem solving, and reliable results below the surface where it matters most.

Jack and bore installation in red soil trench

Underground Utility Installation • PRECISION BORING. PROVEN RESULTS.
Jack & Bore • Pilot Tube Micro-Tunneling

Jack & Bore

Core trenchless installation for roadway, taxiway, and utility crossings.

Pilot Tube Micro-Tunneling

Precision-guided installation for exact line and grade in demanding conditions.

Hands-On Leadership

Field involvement, clear communication, and accountable execution from start to finish.

Services

Built for tough conditions.

Three Point Construction focuses on trenchless and underground utility work with precise execution, strong communication, and real-world problem solving in the field.

Jack and bore installation with excavator and casing

Jack & Bore

Steel casing installation for roadway, railroad, taxiway, and utility crossings using proven auger boring methods.

Pilot tube micro-tunneling with laser alignment

Pilot Tube Micro-Tunneling

Precision-guided installations for exact line and grade control in challenging ground conditions.

Crew working in muddy trench conditions

Hands-On Field Work

Real trenchless installation in real-world conditions with practical problem solving where it counts most.

Deep shoring pit and casing layout
Why Three Point

More than just another contractor.

Three Point Construction is known for dependable service, strong customer support, and affordable pricing.

When projects require extending utilities or installing conduits through congested areas, trenchless methods allow underground installation without disrupting traffic, damaging surrounding infrastructure, or requiring extensive restoration.

Our approach minimizes surface disruption while delivering precise, efficient results — with little to no post-installation restoration required.

Recognition

Proven precision in the field.

Featured Project: Front Steer Micro-Tunneling

Three Point Construction completed one of the first front steer micro-tunneling projects in the United States — requiring extreme precision under active utilities and structural constraints.

Working within inches of critical infrastructure and through hard rock conditions, the team installed a 42-inch steel casing while maintaining exact line and grade.

Completed ahead of schedule, under budget, and within 1/10 of an inch accuracy.

Read Article 1

Hands-On Ownership

Industry coverage highlighted Mike Boyd’s direct field involvement, disciplined approach, and commitment to solving problems early instead of passing them along.

That same hands-on leadership drives every Three Point project — keeping quality high, communication clear, and work moving on schedule.

Read Article 2

Featured Project

Pax River Naval Air Station

Three Point Construction installed two 20-inch sleeves beneath an active taxiway at Pax River Naval Air Station in Maryland — approximately 120 feet each.

The scope included excavation of entry and exit pits, installation of both casings, placement of the water line in each, and full site restoration.

All work was completed in just one week.

Pax River Naval Air Station auger boring work
Mike Boyd standing near excavator on jobsite
About

Built on experience. Led from the field.

Three Point Construction is a family-owned company specializing in trenchless underground utility installation.

Founded by Mike Boyd, the company is built on precision, reliability, and direct involvement in every project. Mike stays closely connected to field execution — helping maintain quality, efficiency, and clear communication from start to finish.

Hands-on leadership. Real accountability. Proven results.

Selected Work

Real projects. Real conditions.

Contact

Call Mike directly and get your project moving.

Contact Three Point Construction to discuss your next project.

Phone: 301-904-4909
Email: Mike.Boyd@threepointco.com