Projects

Real Work.
Proven Results.

Field-tested trenchless installations under demanding conditions.

Selected project photos showing the equipment, conditions, and execution behind Three Point Construction's work.

Jack and bore installation in trench
Featured Project

Pax River Naval Air Station, Maryland

Installed two 20-inch sleeves under an active taxiway, approximately 120 feet each. Excavated the pits, pushed both casings, installed the water line in each, filled the holes back in, and completed the full scope in one week.

Pax River Naval Air Station boring machine setup Pax River casing installation under taxiway Pax River excavator and casing installation Pax River crew and casing installation Pax River jobsite view
Featured Work

Challenging Conditions. Clean Results.

From tight access bores to deep shoring pits, Three Point handles the work others avoid — delivering clean, precise installations where it matters most.

Laser-guided pilot tube micro-tunneling setup
Project Highlights

Pilot Tube Micro-Tunneling

Precision-guided boring setup showing exact line and grade control in the field.

Three Point Construction uses guided systems when accuracy matters most — helping ensure line, grade, and overall installation quality in demanding conditions.

Gallery

Additional Project Photos